IH3963 – HOOVER FERGUSON– MARYWELL TANK FARM – LASER SCAN FLYTHROUGH

On the 18th of January 2017 the current arrangement of Hoover Ferguson’s Tank Farm facility at Cairnrobin Industrial Park, Aberdeen was captured via 3D panoramic colour laser scanner. The captured laser scan data allowed for clash checks between the piping bridge 3D structural design model and the completed ground works to be performed. This process removing the risk of unforeseen clashes between the structure and civil works during the installation phase. This video flythrough can be also be archived by the project team for historical records. It is planned to rescan the entire setup again, once all the construction and equipment are in place and commissioning phase concluded.