3937 SEDCO 712 ADDITION OF STRIPPING TANK SURVEY VIDEO

Standard survey video walk around of the Starboard Aft Moonpool was captured for subsequent briefing with project team for installation of a Stripping Tank. This walk around shows the existing layout of the area in way of the new stripping tank, available space, obstructions to be worked around or repositioned, existing escape route, proximity to the Trip tank for pipe tie in and adjacent pipe runs. The video footage can then be used by the project team to confirm existing as built state for FEA model/analysis, establish clash free functional layout and maximise the footprint load over the existing scantlings, route pipework clash free.