3860-4 SEDCO 714 PORT TOW WIRE EMERGENCY RELEASE SYSTEM (TWERS) SURVEY HEADCAM VIDEO

A walk around the current state of Sedco 714 Port Side Main Deck was captured via RE Surveyor’s Headcam Video as part of Rig Engineering survey deliverable. This video footage forms part of the design input / data gathering for subsequent engineering design and drafting process. This is in relation to the relocation of the existing deck mounted TWERS that was put up under RE Assignment Number 3375 in 2014. Along with conventional manual survey measurement method, against certified Ship Yard As Built (SYAB) drawings, both of this background information will be used during the design and drafting of the new TWERS Installation under RE Job Number 3866 for onsite execution to relocate this TWERS from existing Anchor Buoy Platform to Main Girder Line A to improve workability of the system.