3857-4 SEDCO 711 PORT & STBD PIPING SYSTEM INSIDE FLARE BOOM SURVEY HEADCAM VIDEO

A walk around the current state of both Sedco 711 flare booms was captured via RE Surveyor’s Headcam Video as part of Rig Engineering survey deliverable. This video footage forms part of record of piping system inside respective flare booms as it exists today. The purpose is to catalogue and account for all the pipes running inside the flare boom from elevator shaft top to the end of the flare boom where the burners are located. Along with conventional manual survey measurement method, previous drawings package from RE Job 1288 and 1790, this background information can be used to generate new As Built Piping Inside Flare Boom. For more information, refer to RE Daily Log and Report No. 3857- Sedco 711 Flare boom well test piping survey December 2015.