3836 TEEKAY PETROJARL FOINAVEN – GAS COMPRESSOR AREA TRAIN ‘A’ STATION SURVEY HEADCAM VIDEO

This video walkthrough is taken around the existing Train A Gas Compressor Area located on TK’s Foinaven FPSO Unit. This video footage forms part of the survey archive, along with the 3D Laser Panoramic scans and photographic documentation during a 7 day visit on board Petrojarl Foinaven by Rig Engineering Offshore Construction Engineers. Footage follows the perimeter for planned installation of interconnection piping between Gas Compressors, Conditioning Skid and Control Panels. The video also focuses on tie-in pints located at each side of Compressor Units and at the top/side of conditioning Skid. This, along with proposed 3D piping model routing, cloud scan and isometric drawings forms a design package for upcoming installation on board Foinaven.