Upon successful completion of the project relating to Dry Gas Downstream to Glycol Seal Train ‘B’, Rig Engineering has been tasked to assist TeeKay with survey and downstream design works for piping system of Train ‘A’. A panoramic 3D laser scanning survey of existing equipment and piping tie-ins for the Dry Gas Downstream to Glycol Seal Train ‘A2’, has been performed. This 3D laser scanning was carried out in conjunction with ML Tech System to allow for the capturing of flange connection tie in points. This video shows the walk through of the work place on the vessel. This along with the photographs, sketches, TS 15 readings and Video Headcam forms part of deliverable to TEEKAY for this Train “A” survey. For Headcam Video Walkthrough, please refer to 3836 – Teekay Petrojarl Foinaven – Gas Compressor Area Train “A” Station Survey Headcam Video.