3832 Teekay Petrojarl Foinaven – Train “A” Control Panel and Piping Survey – Laser Scan Video Walkthrough

Following a recent survey on board Teekay Petrojarl Foinaven of Gas Downstream Train “A” (Rig Engineering Job No. 3837), Rig Engineering deployed a Two Men Survey Team to the Teekay Storage Facility in Peterhead. The objective was to survey the two gas control panels that were destined to be shipped offshore in early 2016 for site installation. This survey included 3D Panoramic colour laser scan to capture current state of control panels and supplemented by a series of Leica Total Station TS15 measurements of flange tie ins in conjunction with ML Tech. System. Both of these measurement techniques are needed to produce piping installation drawings that will not require hot work permit during the offshore installation. This data is represented in this cloud walkthrough video.