3773-3 PARAGON MSS1 MA17 – SEWAGE OVERBOARD LINE SURVEY HEADCAM VIDEO

This walkthrough video familiarisation footage has been captured during a site visit on-board the Paragon MSS1 Semi-Submersible drilling unit, July 2015. The purpose of this site visit was to glean information for the various work scopes planned to be executed during the 2016 Out Of Service period (OOS). This walkthrough video captures the current arrangement and condition of the sewage overboard line at the starboard forward column, it is planned to replace and modify this piping run from the underside of the hull to the open end termination at the lower hull. This is required due to missing spools and a leaking flanges. This video will also aid the on shore project team and their contractors during project meeting and briefings.